Application:

Storm Water

Keywords:

California, stormwater, pond, short circuiting, DO, PH

Site map

Training session

SB1250 ready to install

Reservoir Size:

This is a small wetlands pond of 1.0 acres--freshwater in nature.

SolarBee Installation:

Date: 11/10/2006 Installed one SB1250v12 unit in pond

Project Objectives:

Objective: : Primary Objectives are to improve water quality for wildlife habitat. The SolarBee problem to solve is to provide circulation, prevent short circuiting, control surface scum, and increase DO and reduce pH throughout the water column.

For more information on this or any other SolarBee installation, please call 866 437 8076.



^
 