Application:
Storm Water
Keywords:
California, stormwater, pond, short circuiting, DO, PH
Reservoir Size:
This is a small wetlands pond of 1.0 acres--freshwater in nature.
SolarBee Installation:
Date: 11/10/2006 Installed one SB1250v12 unit in pond
Project Objectives:
Objective: : Primary Objectives are to improve water quality for wildlife habitat. The SolarBee problem to solve is to provide circulation, prevent short circuiting, control surface scum, and increase DO and reduce pH throughout the water column.
For more information on this or any other SolarBee installation, please call 866 437 8076.