Application:

Wastewater

Keywords:

Wisconsin, stormwater, DO, odor, blue green algae, sludge

Site map

SolarBee 5000v12 and ship

Crew and testing procedure

Reservoir Size:

This is a CSO pond of13.03 acres.

SolarBee Installation:

Date: 7/27/2008 Installed 4 SB5000v12 units.

Project Objectives:

Objective: Improve dissolved oxygen levels, provide odor control, provide blue-green algae control and enhance organic sludge digestion. Also, reduce the need to operate the current high HP aeration system.

For more information on this or any other SolarBee installation, please call 866 437 8076.



^
 
SolarBee News: