Application:
Storm Water
Keywords:
California, stormwater, stagnant, odors, circulate epilimniom, algae
Reservoir Size:
This is a fresh water, storm water lake of 42.7 acres.
SolarBee Installation:
Date: 9/22/2008 Installed 1 SB10000v12 unit.
Project Objectives:
Objective: The problems to solve are stagnant waters and periodic odors. The SolarBee objectives are to circulate the epilimnion provide surface circulation to control algae growth, prevent surface scum and stagnant waters.
For more information on this or any other SolarBee installation, please call 866 437 8076.
Copyright 2012 SolarBee, Inc.
^
