Application:
Storm Water
Keywords:
California, stormwater, blue green algae
Reservoir Size:
This site is divided into an East section at 17 acres and a West section at 3 acres.
SolarBee Installation:
Date: 5/23/2006 Installed 2 SB2500v12 units in the East section, and 1 SB2500v12 in the West section.
Project Objectives:
Objective: Provide surface circulation to control blue green algae blooms. It is likely that some chemical treatment will still be required to control the invasive weeds, including duckweed and other submerged aquatic vegetation.
For more information on this or any other SolarBee installation, please call 866 437 8076.
Copyright 2012 SolarBee, Inc.
^
